OPTIMIZATION THE COSTS AND DELAY OF THE PROJECT TO REALIZE A TECHNICAL PRODUCT USING PROJECT MANAGEMENT AND TAKING INTO ACCOUNT THE RISKS
Miron ZAPCIU, Georgeta ZAPCIU, Adrian TĂNĂSESCU, Dragoş Constantin TILINA
Abstract: This paper presents the main aspects of a project tasks modelling regarding the case study in which are included the activities’ risk durations, the risks concerning the costs are included and when two models for activities rank correlation assessment based on Spearman and Pearson models taken into consideration. We propose the use of "cruciality" as parameter obtained from multiplication of correlation ranks of two sets of values: sensitivity and the degree of criticity. For an industrial case we’ve determined the tasks with the highest cruciality, the probabilistic finish durations of the project, the costs and we have proposed solutions for the improvement of results. We have used Microsoft Project software and PertMaster Project Risk.
Key words: project management, risk, optimisation of the costs, correlation of the activities and stocks.
Authors: Prof. Dr. Eng. Miron ZAPCIU, "Politehnica" University of Bucharest, MSP Department, E-mail: zapcium@sun.cfic.pub.ro Ph.D. Georgeta ZAPCIU, "Politehnica" University of Bucharest, Power Engineering faculty, E-mail: georgetazapciu@yahoo.fr Drd. Eng. Adrian TĂNĂSESCU, SPECTROMAS S.R.L., General Director, E-mail: adrian.tanasescu@spectromas.ro Drd. Eng. Dragos TILINA, Ph.D. Researcher, "Politehnica" University of Bucharest, MSP Department, E-mail: tilina_dragos@yahoo.com Electronic mail: orgcom@icmas.eu / General Information: http://www.edition2009.icmas.eu/
|