|
ISSN 1842-3183 |
|
Proceedings of the 15th International Conference on Manufacturing Systems – ICMaS Published by Editura Academiei Române, ISSN 1842-3183 Volume No. 1, 2006 "Politehnica" University of Bucharest, Machine and Manufacturing Systems Department Bucharest, Romania, 26 – 27 October, 2006
pp. 559-562
ACTIVITIES PLANNING AND SCHEDULING USING TIT METHOD IN PRODUCTION WORKSHOPS
Corneliu NEAGU, Maria Magdalena ROŞU, Mădălin Gabriel CATANĂ, Lucia Violeta MELNIC
Abstract: For eac h production task or activity carried out in production workshop the decisions are made on two characteristic tips: time characteristic, that requires to allocate time for task execution, considering the time constraints and resource characteristic, that requires to allocate one or more resources, considering the resource constraints. Therefore, the decision is the result of constraints given by time and resource limits. The method of time-intensity-task triad, TIT, permits to take both time and resource aspects into consideration, being suited for a hierarchical approach to decision making in production workshops.
Key words: time, intensity, task, constraints, time horizon, time segmentation, task cell.
Authors: Dr. Eng., Corneliu NEAGU, Professor, "Politehnica" University of Bucharest, Production Engineering (TCM) Department, E-mail: necor_upb@yahoo.com Ph.D. Student Eng., Maria-Magdalena ROŞU, Assist. Prof., "Politehnica" University of Bucharest, Production Engineering (TCM) Department, E-mail: magdalenarosu@yahoo.com Dr. Eng., Mădălin-Gabriel CATANĂ, Lecturer, "Politehnica" University of Bucharest, Production Engineering (TCM) Department, E-mail: mg_catana@yahoo.com Dr. Eng., Lucia-Violeta MELNIC, Lecturer, "Ovidius" University of Constanţa, Faculty of Mechanical Engineering, E-mail: lmelnic@univ-ovidius.ro Electronic mail: orgcom@icmas.eu / General Information: http://www.edition2009.icmas.eu/
|